Skip to content
hello@summitridgeroofing.com
Summit Ridge Roofing

Project · Austin, TX

Shingle Roof Replacement

A hail-worn 18-year-old roof, replaced end-to-end in two days — with ventilation the original builder skipped.

The Challenge

Granule Loss, Soft Decking, and a Second Layer Hiding Underneath

The homeowners called after finding shingle grit piling up in their gutters. Our inspection found widespread granule loss from a hailstorm two seasons back, two soft deck sections near a valley, and — the surprise — a second shingle layer from a previous overlay job, trapping heat and voiding any warranty path. Repair would have been money into a roof with no base left to save.

Our Approach

Down to the Deck, Then Back Up Better

We stripped both layers, replaced the soft decking, and installed a full architectural shingle system: synthetic underlayment, ice-and-water shield in valleys, new flashing at every penetration, and — the upgrade the attic desperately needed — a balanced ridge-and-soffit ventilation path. Two days on site, magnetic sweep twice daily, and a signed walkthrough with photos of every layer we installed.

Two roofers in safety harnesses working on a shingle roof
Roofer in a safety harness fastening shingles

“They showed us photos of the rotten decking before touching it and the new ventilation makes the upstairs noticeably cooler. Two days, zero mess left behind.”

The Henderson Family · Homeowners, Austin TX

More Projects